
The Scaffold Group installed and supplied temporary shoring and access for a 275,000-lb beam installation at the airport’s new front entranceway,

JoeAnna's House provides accommodations for families of patients receiving advanced medical care at Kelowna General Hospital. The Scaffold Group supplied a temporary staircase during renovations.


Access scaffold utilizing custom tie-through solutions to limit building penetrations for modern pressure testing, complete with full hoarding, garbage chute, overhead protection, and dedicated loading bays

The Scaffold Group supplied a weather protection system enabling uninterrupted construction in mountainous winter conditions.

Full perimeter scaffold solution supporting a complete envelope upgrade, including insulation, cladding, and window installation, with debris netting, garbage chutes, and multiple access stair towers for safe, efficient site movement.

The Scaffold Group provided a full weather-protection temporary roof enabling a live-in second-storey home addition after complete roof removal.
This website uses cookies. By continuing to use this site, you accept our use of cookies.